Price in writing, in 48 hours
A drawing or a part description goes to an application engineer, not to a price list. You get a machine proposal, a fixture note and a written price.
BEFORE YOU ORDER
Machine tools are bought on trust and on paper. This page is the paper: what we quote, what we promise, what you pay and when. If a term is not here, ask and we put it in the PI.
A drawing or a part description goes to an application engineer, not to a price list. You get a machine proposal, a fixture note and a written price.
Your part is cut on the machine we propose, in Dongguan, before dispatch. Cycle time, inspection sheet and video go back to you — or you come and watch it.
What the price covers and what it does not is written down on this page. Freight, duty and installation are quoted separately and labelled.
The same person follows the order from PI to the first part. No handover to a queue after the deposit clears.
PURCHASING PROCESS
Six steps, no skipped stages, no surprises after the order is placed.
Drawing, 3D file or a sample photo with material, tolerance and batch size.
We confirm the machine family, the fixture, the tooling list and the cycle time estimate.
Price, configuration list, packing, freight basis and lead time in one document.
PI with bank details, payment schedule and delivery terms. Valid 30 days.
Production slot is booked when the deposit arrives. Weekly progress photos on request.
Test cut and geometric check at our plant — you visit or receive the report and video. Balance clears, then we book the vessel and issue the documents.
SALES TERMS
These are our standard terms. Any deviation is negotiated before the PI and written into it.
Price basis
FOB Shenzhen
CIF and DAP quoted on request with the destination port named.
Payment
60% deposit, 40% before shipment
T/T to the company account. L/C at sight accepted for orders above USD 50,000.
Lead time
45 days standard
Measured from the day the deposit clears. Customised configuration adds 15–30 days.
Minimum order
One machine
Spare parts and tooling ship from stock with no minimum.
Inspection
In China, before dispatch
Buyer visit at our plant, or test cut video plus a geometric report. Third-party inspection (SGS, BV) in China at buyer cost — we have no inspection team abroad.
Packing
Fumigated wooden case
Vacuum bag, rust preventive, anchored to the case floor. Sea-worthy for 40 days.
Warranty
12 months from B/L date
Parts and labour on defects in our scope. Consumables and wear items excluded.
Documents
Invoice, packing list, B/L
Plus CE declaration, certificate of origin and manual in English on every shipment.
PAYMENT SCHEDULE
Money moves only when something has been delivered: a slot, a machine, an installation.
Bank details are stated on the proforma invoice only. We never change an account number by e-mail — verify by a call before any transfer.
WHAT THE PRICE COVERS
The left column is in the machine price. The right column is quoted separately, always labelled on the PI.
SHIPPING & DOCUMENTS
Packing, loading plan and paperwork follow the same schedule as production.
Packing
Fumigated plywood case, vacuum bag inside, machine anchored to the case floor with bolts. Rust preventive applied to all bare surfaces.
Loading
A drilling & tapping centre fits two units in a 40HQ. A gantry centre is loaded flat-rack or break-bulk — we send the loading plan with the PI.
Ports
Shenzhen, unless the destination asks for another port. Yantian and Shekou are the usual loading terminals.
Documents
Commercial invoice, packing list, bill of lading, CE declaration, certificate of origin, insurance certificate when CIF.
Tracking
Photos at packing, at the port and the B/L copy are sent the day the vessel sails.
LOGISTICS & FREIGHT
Freight is not part of the machine price. Pick the trade term that matches how your company buys, and the split below applies.
We handlePacking, inland trucking, export clearance, loading on board.
You handleOcean freight, insurance, destination charges, import duty.
Risk passes when the machine is on board at Shenzhen.
We handleEverything in FOB, plus ocean freight and marine insurance to the named port.
You handleUnloading, destination charges, import duty, inland transport.
Risk passes at the port of loading; insurance covers the sea leg.
We handleFreight, insurance and delivery to the site, duty unpaid.
You handleImport duty, VAT, unloading and any crane at destination.
Risk passes when the machine arrives at the named place.
We handleMachine ready at our plant, packed for export.
You handleEverything from our gate onwards.
Risk passes at our plant — only for buyers with their own forwarder in China.
Figures are for a standard machine in standard packing. Case size and gross weight are confirmed on the packing list.
Sea freight — FCL
Full container, the normal route for a machine. Booked 7–10 days before the vessel, two sailings a week from Yantian.
Sea freight — LCL
For a single machine to a smaller port, or when two buyers share a container. Add 10–14 days for consolidation.
Air & express
Spare parts, tooling and controllers only. 3–5 days door to door, quoted by weight on request.
Transit times
Ho Chi Minh 5–7 days · Laem Chabang 7–9 · Port Klang 8–10 · Nhava Sheva 15–18 · Rotterdam 30–35 · Hamburg 32–38 · Los Angeles 20–25 · Santos 35–40. Indicative, excluding transhipment waiting.
WARRANTY & AFTER-SALES
Warranty covers parts in our scope for 12 months from the bill of lading date.
Response
WhatsApp, e-mail or a call. Alarm codes and parameter files are kept on record for every machine we ship.
Spare parts
Bearings, belts, solenoid valves, tool holder parts and control modules. Air freight within 3–5 days.
Remote diagnosis
Screen share or a network link to the control. Most alarms are cleared without a visit.
Training & installation
Operator training here before shipment, or live video sessions after arrival. Overseas installation is guided remotely — there is no service team abroad yet, so a local partner can be recommended for rigging.
QUESTIONS BEFORE THE ORDER
Something not covered? Send it on WhatsApp — it usually gets an answer the same day.
Can I see the machine running before I pay the balance?
Yes, in our plant in Dongguan. Inspection is done here in China: you either visit and watch the test cut on your own part, or we send the cycle time, the inspection sheet and a video. We do not offer inspection at your site, because our team does not travel abroad for inspection. If you need a third party (SGS, BV, TÜV), we host them here at your cost.
What happens if the machine arrives damaged?
Packing is photographed before loading. Any damage found at destination is claimed against the insurance or the carrier, and we ship the replacement parts at our cost when the damage comes from packing or loading.
Do you accept L/C?
L/C at sight is accepted for orders above USD 50,000, issued by a bank we can confirm. For smaller orders the standard is 60% T/T deposit and the balance before shipment.
Can the machine be customised for our part?
Travel, table size, spindle taper, tool capacity, coolant and the control can be changed. Customisation moves the lead time to 60–75 days and the configuration is frozen on the PI, so nothing changes after the deposit.
Is CE marking included?
A CE declaration of conformity and the technical file summary ship with every machine sold into the EU and UK. Electrical components are selected for the destination voltage and plug standard.
Who handles installation?
You do, with our guidance. We do not have a service team abroad, so installation is supported remotely: levelling procedure, electrical connection diagram, air and coolant hook-up, then a live video session to check alignment and run the first part. For heavy rigging we can name a local partner in your country — the contract with them is yours, not ours.
How long does a spare part take to arrive?
Common wear parts ship from stock within one working day, 3–5 days by air. Control modules and spindles are quoted with the lead time at the moment you ask.
What is the warranty on a used or demo machine?
Demo machines carry the same 12-month warranty on parts in our scope, with the running hours stated on the PI. Used machines are sold as inspected, with the report attached.
TECHNICAL DATA SHEET
Series datasheet · PDF, 1 page
Tell us where to send follow-up questions and the PDF opens immediately. No newsletter, nothing shared.
Used to follow up on this request only. See our privacy policy.