Automotive
Valve bodies, four-up fixture on a VMC
A four-station fixture that turned a single-part valve body job into a four-part cycle, with the operator loading outside the machine.
Read caseCASE STUDY Automotive
A CMM station beside the cell that turned first-article inspection from a two-day wait into a 20-minute check.
With the knuckle cell running four-up, every setup change needed a first article signed off. The CMM lived in the quality room, so the machine sat idle while the part waited in a queue.
The CMM now sits at the cell, with the same program as the quality room and a fixture that repeats the clamping. The operator runs the check and releases the batch without leaving the cell.
First article takes 20 minutes instead of two days, and four checks per shift is now normal rather than an event.
TECHNICAL DATA SHEET
Series datasheet · PDF, 1 page
Tell us where to send follow-up questions and the PDF opens immediately. No newsletter, nothing shared.
Used to follow up on this request only. See our privacy policy.